|
|
|
| |
| |
The Difference Between "Fully Engineered and Accounted" and "Residual" Studies
The Cost Seg America team performs a TIER ONE study, which is also called a “fully engineered and accounted” methodology. This study is forensic in its detail of both accelerated property (5, 7, and 15 year items) as well as the straight-line (39 or 27.5 year items), maximizing the allowable IRS deductions. The typical TIER THREE study, which is also called a "residual" methodology, do not provide the same level of detail in front-loaded (accelerated) property, and usually bundle the straight-line property in just a few categories.
Why does this matter? Firstly, the Cost Seg America teams “fully engineered and accounted” methodology delivers complete asset management detail on all accelerated and straight-line items. The "residual" studies identify just the standard items and miss the hidden electrical, plumbing and mechanical details, leaving your money on the table. Secondly, the Cost Seg America teams report serves as an asset management report allowing you to easily identify future abandonment/disposition of items for future upgrades, improvements or repairs, and is in full compliance with the IRS Tangible Property Regulations. |
| | | |
|
|
| |
www.costsegamerica.com 888-865-4401 [email protected]
"The information contained this newsletter is meant for guidance purposes only and does not in any way constitute legal or tax advice. Readers should seek advice from their CPA or Accountant in relation to information contained in these articles." |
| | | |
|
|