An engineered cost segregation study on a office property in Arab, Alabama reclassified approximately $602K (32%) of a $1,873,003 property basis into faster federal depreciation.
Cost Seg America examines the building, site work, and mechanical, electrical, and plumbing components through an engineered cost segregation study.
An engineered cost segregation study on a office property in Arab, Alabama reclassified approximately $602K (32%) of a $1,873,003 property basis into faster federal depreciation.
Property details
25,190 SF
Building Size
