🇺🇸 Made in America·100% U.S.-Based Team · 24+ Years in Cost Segregation
Home / Case Studies / Playbook

Engineered Cost Segregation Case Study

An industrial property in Springfield, Missouri moved $295K into faster depreciation.

Springfield, Missouri

An engineered cost segregation study by the Cost Seg America team. Explore this property’s study results below.

$887,974

Cost Basis

$295K

Reclassified into Faster Depreciation (Approx.)

33%

Reclassification Rate

An engineered cost segregation study on a industrial property in Springfield, Missouri reclassified approximately $295K (33%) of a $887,974 property basis into faster federal depreciation.

Cost Seg America examines the building, site work, and mechanical, electrical, and plumbing components through an engineered cost segregation study.

An engineered cost segregation study on a industrial property in Springfield, Missouri reclassified approximately $295K (33%) of a $887,974 property basis into faster federal depreciation.

Property details

3,000 SF

Building Size

What could your property deliver?

A free proposal takes 24 hours and costs nothing. Discover what a study could mean for your specific property.

Get Your Free Proposal →

1-888-365-5023 · info@costsegamerica.com

← Back to all case studies