An engineered cost segregation study on a industrial property in Columbus, Ohio reclassified approximately $947K (40%) of a $2,372,500 property basis into faster federal depreciation.
Cost Seg America examines the building, site work, and mechanical, electrical, and plumbing components through an engineered cost segregation study.
An engineered cost segregation study on a industrial property in Columbus, Ohio reclassified approximately $947K (40%) of a $2,372,500 property basis into faster federal depreciation.
Property details
20,000 SF
Building Size
